Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2008 | ENGINEERING - FINAL | Approved | ||
| 04/09/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO 1. INSTALL H/C PARKING SIGNS AT REQUIRED HEIGHT AND WITH 2 BOLTS IN EACH SIGN. 2. STRIPE H/C PARKING SPACES 3. REPLACE BROKEN WHEEL STOP. 4. PIN WHEELSTOPS AT FRONT H/C PARKING SPACES. |
|
| 04/08/2008 | ENGINEERING - FINAL | Not ready for Inspection | MEGAN 270-0357 WILL RESCHEDULE INSPECTION FOR TOMORROW. |