Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM05973
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/13/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | UNDERGROUND FOR PHOTO LAB OK TO COVER WATER TEST OK |
|
03/19/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1. PLUMBER PLEASE NOTE: ALL FITTINGS, INCLUDING CLEANOUTS, TEST FITTINGS, ETC. ARE TO OPEN IN THE DIRECTION OF FLOW. NEVER INSTALL A FITTING BACKWARDS!!! 2. OK TO COVER |
|
03/16/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. NOT INSTALLED PER PLAN PLAN CALLS FOR PVC - INSTALLED IS ABS 2. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 3. FEMALE THREADS ON ABS NOT PERMITTED IN INACCESSIBLE LOCATION, BESIDES A BLACK TEE IS LISTED AS A VERTICAL SURFACE WALL CLEANOUT 4. WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN, IT SHALL HAVE ITS INVERT TAKEN OFF ABOVE THE DRAINAGE CENTERLINE. EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN 6" ABOVE OVERFLOW BEFORE OFFSETTING HORIZ. 5. WET VENTING IS LIMITED TO VERTICAL DRAINAGE PIPING. |