Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2007 | ENGINEERING - FINAL | Approved | ||
| 02/13/2007 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to: 1- Remove trash dumpster and mini storage units. 2- Clean parking lot. 3- Remove construction debris from sidewalk. 4- Clean wash out from landscaped area. |
|
| 02/09/2007 | ENGINEERING - FINAL | Partial Approval | RECVD CALL FROM LEE RAY HE HAS AUTHORIZED THE RELOCATION OF THE H/C PARKING SPACE FROM REAR OF BUILDING AT NEW ROLL UP DOOR LOCATION TO SOUTH OF THE BUILDING THIS WORK WAS NOT ON THE PLANS |
|
| 02/07/2007 | ENGINEERING - FINAL | Partial Approval | COmplete all items on 1/31/07 inspection prior to final C of O. | |
| 01/31/2007 | ENGINEERING - FINAL | Denied | -REMOVE DUMPSTER S OF BLDG -CLEAN UP DRYWALL WASH OUT S OF BUILDING |