Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2007 | ENGINEERING - FINAL | Approved | TRIP TO SITE-CANCELLED UPON ARRIVAL | |
| 12/06/2007 | ENGINEERING - FINAL | Approved | SEE ATTACHED LETTER FROM BAKER AND ASSOCIATES ENGINEERING/MARTIN MAGELLI P.E. FOR DRAINAGE AT THIS BUILDING. I ADVISED VENTURE WEST TO PROVIDE POSITIVE DRAINAGE IN DRAINAGE SWALES AND LANDSCAPED AREAS. |
|
| 12/05/2007 | ENGINEERING - FINAL | Denied | 1. SEE NOTE #2 ABOVE 2. ENGINEER TO DETERMINE PROPER DRAINAGE AND SIDEWALK SCUPPERS NEEDED. 3. PATCH ASPHALT PAVING IN FRONT OF BUILDING. 4. ADDRESS ROOF DRAINAGE DISCHARGE ONTO SIDEWALKS. |
|
| 12/04/2007 | ENGINEERING - FINAL | Denied | 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AFTER ALL TRADES ARE COMPLETE. 2. SHOW NEW SIDEWALK ON THE REVISED AND C.O.T APPROVED SITE PLAN. PROVIDE AND ENGINEER'S STATEMENT REGARDING THE SIZE OF TYPE II SIDEWALK SCUPPER AT REAR ENTRANCE SIDEWALK. 3. REMOVE TRASH ROLL-OFF. 4. REMOVE PORTABLE TOILET. |
|
| 11/13/2007 | ENGINEERING - FINAL | Not ready for Inspection | CANCELED NOT READY |