Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 01/26/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/24/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. SINK REQUIRES 2" WASTE = 2 D.F.M UPSIZING TO 4" DOES NOT MAKE A BETTER SYSTEM UPSIZING OF PIPE IS SUBJECT TO APPROVAL OF ARCHITECT/ENGINEER. 2. PLAN CALLS FOR N/H CAST IRON - INSTALLED IS PVC 3. REDLINE ALL CHANGES TO THE PLAN. USE "RED" TO MAKE THESE NOTED CHANGES. |