Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2008 | ENGINEERING - FINAL | Approved | ||
| 03/12/2008 | ENGINEERING - FINAL | Denied | 1) PROVIDE SIDEWALK SCUPPER PER P.C./COT STANDARD DETAIL 204, SEE PLAN A-2 ROOF PLAN 2) PROVIDE CONCRETE SPLASH BLOCKS PER PLAN AT ROOF DRAINS 3) PROVIDE POSITE DRAINAGE AT REAR OF BLDG |
|
| 01/17/2008 | ENGINEERING - FINAL | Denied | 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. GRADE AREA AT REAR OF BLDG. |