Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM05781
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/04/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
03/27/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* NO EQUIPMENT |
|
03/05/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* NEED TO SEE MEDICAL EQUIPMENT |
|
01/19/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK TCO PHASE 1 1. UNWIRE UNUSED POLE AS PER MCGETRICK INSTRUCTIONS IN CONTROL CABINET. |
|
01/11/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* FINISH ITEMS #2, 4, 5 |
|
01/10/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. VDV CABELING TO BE SUPPORTED AS PER 725.6 & 300.11 2. BOXES MORE THAN 1/4" FROM BOX TO SURFACE NEED APPROVED EXTENDER RINGS 314.20 3. WHERE IS DISCONNECTING MEANS FOR ROOM A/C UNIT. 4. CONTROL CABINET IS 3 PHASE WIRED. POWER SUPPLIED IS ONLY SINGLE PHASE. 5. NEED TO SEE MEDICAL EQUIPMENT TO VERIFY LISTINGS. |