Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06CM05780

Parcel: 141185710

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
08/24/2007 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
WATER TEST FOR PIPING IN & OUT OF EJECTOR SUMP OK
WITH VENT FOR SUMP OK
08/23/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
WATER TEST 3" VENT FROM SUMP OK

1. SHALL PROVIDE CAST IRON VENT ABOVE GRADE AT BUILDING
2. SHALL INSTALL DISCHARGE PIPING PER 2003 UPC
3. SHALL WATER TEST SEWER EJECTOR PUMP
08/20/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST NOW 4" BLDG SEWER FROM EXISTING TO 5' FROM LIFT STATION SUMP
2) 4" GRAVITY SEWER FROM 10' FROM SUMP TO HCS CONNECTION TO PUBLIC SEWER OK
3) SHALL SEE CONTINUATION OF PIPING WITH TEST INTO AND OUT OF SUMP
05/31/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
05/29/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SHADING MATERIAL AROUND 4" ABS OK FROM BUILDING THRU 2-WAY & BACKWATER VALVE TO 92' EAST OK
05/25/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" ABS BUILDING SEWER FROM 4" BUILDING DRAIN STUB GOES EAST 92' INCLUDING CLEANOUTS WITH BACKWATER
VALVE INSTALLED AND INLINE CLEANOUT STUB UP
WATER TEST OK ONLY.

1. BEFORE COVERING PROVIDE 1/2-MATERIAL AS SHADING AND BEDDING WITH INSPECTION AND PROOF OF NEED FOR BACKWATER VALVE WHEN UPSTREAM MANHOLE IS INSTALLED.
04/13/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
WATER TEST OK
1. ALL PIPING SHALL NOT BE DIRECTLY EMBEDDED IN CONCRETE. PROVIDE PIPE WRAPS.
2. SHALL PROVIDE DETAIL & HAVE BUILDING INSPECTOR APPROVED PIPES THRU BUILDING FOOTING.
04/09/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST UNDERGROUND THRU BLDG TO 2-WAY CLEANOUT OK
2) SHALL SEE PIPE WRAPS AND CORRECTION FOR PIPE THRU FOOTING PRIOR TO CONCRETE
04/06/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST THRU BLDG TO 3' EXTERIOR N.E. CORNER PARTIAL APPROVAL
2) SHALL PROVIDE CORRECT DRAINAGE FITTING FOR PLAN TO 2003 UPC FOR BACK TO BACK FLOOR DRAINS AT MENS AND WOMENS RESTROOMS
3) NO PIPING SHALL PASS DIRECTLY THRU BLDG FOOTINGS AT AREAS OF END OF LINE CLEANOUTS. MAKE CORRECTIONS AND RETEST THOSE AREAS
2)