Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2007 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 08/23/2007 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 1 1/4" PVC TO PUMP LIFT STATION |
|
| 08/08/2007 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OK 1 - 4" PVC FROM TEP X-FORMER TO SES 2. APPROVED PLANS NEED TO BE AVAILABLE FOR ALL INSPECTIONS 3. CANNOT USE CHASE NIPPLES AND THREADED COUPLING FOR CONNECTION OF CT CAN TO MAIN DISCONNECT 4. INSTALL WARNING RIBBON ABOVE SERVICE ENTRANCE CONDUCTORS PER PLAN & NEC 300.5 WILL CHECK AT SERVICE INSPECTION. |
|
| 08/03/2007 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO HAVE APPROVED SET OF DRAWINGS ON SITE AND AVAILABLE TO INSPECTOR FOR INSPECTIONS 2. CANNOT USE WAX CORE FOR SECONDARY CONDUCTOR FROM TEP TRANSFORMER TO SES. NEED TO USE RECOGNIZED WIRING METHOD OF CHAPTER 3 OF NEC ALSO, NEEDS TO BE LISTED PRODUCT 3. NIPPLE BETWEEN CT CAN & DISCONNECT NEEDS TO BE BONDED PER NEC 250.92 4. DISCONNECT SWITCHES AT SERVICE LOCATION ARE HIGHER THAN 6'7" -- NEC 404.8 5. NOT A COMPLETE SERVICE INSPECTION |
|
| 08/02/2007 | ELECTRIC - UNDERGROUND | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY ELECTRICAL CONTRACTOR |