Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2007 | ENGINEERING - FINAL | Approved | ||
| 07/03/2007 | ENGINEERING - FINAL | Not ready for Inspection | ENSURE TRUNCATED DOMES ARE LOCATED ON BOTH SIDES OF PEDESTRIAN WALKWAY. ENSURE THERE IS A VERTICAL SEPARATION OR A PHYSICAL BARRIER BETWEEN WALKWAY AND VEHICULAR TRAFFIC. |
|
| 06/13/2007 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O WITH THE AGREEMENT THAT OCCUPANTS WILL NOT USE THE FACILITY DURING TIMES OF ACTIVE CONSTRUCTION AND WILL PROVIDE SAFE ACCESS TO AND FROM THE BUILDING PER YOUR LETTER SUBMITTED TO THE CITY OF TUCSON. CALL FOR RE-INSPECTION WHEN CONSTRUCTION IS COMPLETED. |
|
| 06/07/2007 | ENGINEERING - FINAL | Denied | A NEW SITE PLAN FOR THIS PROJECT HAS BEEN SUBMITTED AND APPROVED. PRIOR TO APPROVAL FOR C OF O FOR ENGINEERING COMPLETE SITE WORK PER YOUR APPROVED PLAN. FOR AN APPROVAL BY ENGINEERING FOR A TEMPORARY C OF O, PROVIDE A PLAN SHOWING SAFE, ADA COMPLIANT ACCESS FOR PUBLIC WHILE CONSTRUCTION IS BEING DONE. |
|
| 05/11/2007 | ENGINEERING - FINAL | Denied | NOT READY FOR INSPECTION 1. IDENTIFY IF NEW PAVING IS REQUIRED FOR NEW PARKING SPACES. 2. SWEEP EXISTING PAVEMENT AND SHOW ON THE PLAN. 3. STRIPE PARKING LOT PARKING SPACES. 4. PROVIDE A.D.A. COMPLIANT PEDESTRIAN ACCESSWAYS. 5. PROVIDE 24' OPENING IN GATE AT ENTRANCE, UNLESS EXISTING 20' OPENING IS ADEQUATE. SHOW CORRECT DIMENSION ON PLAN. 6. PROVIDE BICYCLE PARKING 7. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |