Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) PLAN CALLS FOR CPVC-YOU INSTALLED PEX. PLAN CALLS FOR PVC WASTE-YOU INSTALLED ABS. PROVIDE STAMPED LETTER FROM J.A.C.A. ACCEPTING MATERIAL TYPE, AND YOU ARE OK TO COVER-SUBJECT TO THAT APPROVAL 2) REPLACE ABS SECTION BETWEEN TWO N/H SECTION, AND REPLACE WITH CAST IRON 3) OK TO COVER ALL AREAS |
|
| 05/02/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. NOT INSTALLED PER PLAN NO REDLINES ON SITE INSTALLATION NOT PER CODE MAY NOT DUMP A DRAIN INTO A VENT EXISTING SERVICE SINK DOES NOT EXIST |