Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM05759
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2009 | ENGINEERING - FINAL | Approved | ||
11/10/2008 | ENGINEERING - FINAL | Partial Approval | 1) OK FOR TEMP C OF O 2) CONTRACTOR NEEDS TO COMPLETE ALL ITEMS ON PUNCH LIST 3) SEPARATE ALL CONSTRUCTION ACTIVITY, MATERIALS, AND DEBRIS FROM PUBLIC ACCESS. |
|
11/03/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Stabilize all areas disturbed by construction. On site and outside grading limits. 2- Provide site cert. from engineer per C.O.T. D.M. chapter XIV, section 14.2(7). 3- Scupper all down spouts under sidewalk per C.O.T. D.S. 4- Complete all rip rap work per approved drawings. 5- Provide pos. flow northwest corner of project. 6- Complete all basin work. Install per approved drawings. 7- Install handrail northwest corner, public access. 8- Rip Rap all slopes steeper then 3 to 1. 9- Install gates on trash enclosure and paint bollards in enclosure. 10- Complete spillway on northwest corner of project. 11- Install all bike parking per approved drawings. 12- Engineer needs to address safety barrier on northside of basin. 13- Complete all striping. 14- Separate all construction activity from public access. 15- Separate all construction debris from public access. 16- Install vertical curb per detail K on approved drawings. 17- Install driveway on northeast corner per detail G on approved drawings. |