Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/15/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ||
| 04/27/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* FAILURE TO COMPLY SHALL RESULT IN REFEE. 1. SHALL SECURE CLOSET FLANGES WITH WATER RESISTANT FASTENERS AFTER FINISH FLOORING IS INSTALLED TO FLOOR . 2. SHALL PROVIDE CORRECT SHOWER PAN WATER PROOFING MATERIAL WITH CORRECT SLOPE TO DRAIN AND HAVE INSPECTED PRIOR TO SHOWER FLOOR TILE PER 4/9/07 INSPECTION. |
|
| 04/09/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) TEST SHOWERS 2) INSPECTION FOR CLOSET FLANGES |
|
| 04/05/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. CALL BACK FOR CLOSET RINGS BEFORE SETTING WATER CLOSETS AND SHOWER TEST |
|
| 04/04/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. FILL TUBS UP HALFWAY OVERFLOW 2. YARD WATER TRENCHES NEED TO BE CLEANED OUT OF ROCKS. AND HAVE APPROVED SOIL ON SITE FOR BACKFILL. 3. PROVIDE VACUUM BREAK ON HOSE BIBBS 4. PROVIDE LADDER TO GET ON ROOF. |
|
| 03/30/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELLED |