| 02/02/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) FLOOR SINK FOR ? FAR NORTH SIDE OF BLDG NEEDS TO BE INSTALLED |
|
| 01/29/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDERGROUND PIPING OK PER REDLINE ON SITE TO BE CITY APPROVED PLAN AT LATER DATE. 1. SHALL SEE PIPE WRAPS & FLOOR DRAIN AND SINKS. |
|
| 01/25/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" GREASE WASTE WATER TEST PER REDLINE ON SITE OK PENDING REVISED CITY APPROVED PLAN. 1. SHALL SEE SANITARY DRAINAGE FOR (2) P-4'S, P-5 AND SINK AND P5 FLOOR SINKS. |
|
| 01/18/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDERGROUND SANITARY DRAINGE SOUTH HALF FROM EXISTING PER REDLINE ON SITE WATER TEST OK 1. UPPER TERMINAL CLEANOUT TO BE TERMINATED CORRECTLY BECAUSE OF DAMAGE EXPOSED FROM WATER TEST. |
|
| 01/17/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* TEST SHALL HOLD WITH NO WATER LOSS |
|
| 01/09/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST 4" GREASE WASTE FROM 4" STUB 2' ON INTERIOR THRU INTERCEPTOR WITH VENT TO BUILDING INTERIOR TO CONNECTION TO EXISTING BUILDING SEWER PER REDLINE ON SITE. REDLINE TO BE ON SITE WITH CITY REVISED APPROVED PLAN AT FUTURE DATE. NOTE: PROVIDE TRACER WIRE FOR STUB FROM BUILDING TO INTERCEPTOR. |
|
| 01/08/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* VENT FROM INTERCEPTOR TO BE MINIMUM 45 DEG. UP FROM HORIZONTAL WITH LONG RADIUS FITTINGS BELOW FLOOD RIM OF INTERCEPTOR. |