Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2007 | ENGINEERING - FINAL | Approved | ||
| 10/16/2007 | ENGINEERING - FINAL | Partial Approval | PARTIAL APPROVAL FOR ENGINEERING FOR A C OF O. PERMANENT APPROVAL NOT TO BE GIVEN UNTIL AN APPROVED SITE PLAN SHOWING CHANGES MADE IS AVAILABLE FOR INSPECTION. |
|
| 10/09/2007 | ENGINEERING - FINAL | Denied | 1) COMPLETE OVERHEAD WORK. 2) SEPARATE CONSTRUCTION ACTIVITY FROM PUBLIC ACCESS. 3) INSTALL BICYCLE PARKING PER PLAN. 4) INSTALL GATES FOR TRASH ENCLOSURE PER PLAN. 5) PROVIDE AN APPROVED DRAWING SHOWING CHANGES MADE TO THE DRAINAGE CHANNEL ALONG THE EAST SIDE OF BUILDING, ENSURE DRAWING IS APPROVED BY THE CITY OF TUCSON. 6) PROVIDE AN APPROVED DRAWING SHOWING THE CURB OPENING INSTALLED AT THE NORTHWEST CORNER OF SITE. 7) COMPLETE ALL ITEMS ON YOUR APPROVED PLAN, AND CALL FOR RE-INSPECTION. |