Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM05677
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* ALL CLOSET FLANGES OK |
|
10/30/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NEED TO SEE NORTH AREA OF CORRIDOR CLOSET FLANGES ONLY |
|
10/03/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
10/02/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DWV & WATER PIPING FOR EWF & SINK WITH RESTROOMS 141, 144, 145 AND JANITOR 139 OK INSULATION IN WALL OK |
|
10/01/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
09/30/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CLOSET FLANGES IN RESTROOMS #172 & 173 OK WATER DISTRIBUTION FOR RESTROOM #141, 144, 145 AND JANITOR #139 OK |
|
09/29/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
09/19/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DWV TO VENT CONNECTOR ABOVE CEILING AT (2) LOCATIONS WITH WATER PIPING PER INITIAL P1.0 MAIN EAST WEST CORRIDOR |
|
07/23/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* INSULATION ON HOT & HOT RETURN PIPING IN WALL AND OVERHEAD PER INITIAL PAGE P1.2 BLUE SHEETS |
|
07/18/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DWV FOR SINK AT COFFEE BAR THRU ROOF OK WATER OVERHEAD THRU CUSTOMER WAITING TO COFFEE BAR TO END OF HALL PER INITIAL P1.2 |
|
06/25/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 2 - SETS 4" RD & 4" OFRD AT NORTHEAST & SOUTHEAST CANOPY WATER TEST AND HANGERS OK |
|
06/16/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* TRAP PRIMER OK IN 173, HANGER OK IN 172 |
|
06/12/2008 | PLUMBING - INTERMEDIATE | Partial Approval | PVC DWV AT RESTROOMS 172 & 172A PLUS COPPER FROM 164 OVERHEAD TO BATHROOM GROUP OK FOR INSULATION |
|
04/08/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SUPPORT BACKFLOW DEVICES ON DISCHARGE SIDE |
|
04/04/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 4" FLOOR SINK INSTALLED AT OK STORAGE AREA |
|
04/03/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - TEST ON INTERCEPTOR VENT THRU ROOF OK - ALL INTERMEDIATE IN SERVICE BLD. OK - REDLINE ALL CHANGES ON APPROVED PLANS - INSTALL FLOOR SINK PER PLAN AT COMPRESSOR AREA TO BE INSTALLED PER PLAN. NOTE: 4" FULL SIZE CLEANOUT REQUIRED P-TRAP IS NOT |
|
04/01/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER DISTRIBUTION IN SERVICE AREA OK PENDING SEALED LETTER FROM ENGINEER DELETING WATER TO OVERHEAD HOSE REELS AND INSTALLATION OF CORRECT BACKFLOW PROTECTION FOR CAR WASH IF REQUIRED. |