Permit: T06CM05677

Parcel: 130140230


Addresses:

4220 E 22ND ST

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
03/17/2009 REINFORCED MASONRY PRE-GROUT Approved
07/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ONLY CMU SITE WALL ON WEST SIDE RUNNING EAST TO WEST TOPOUT
07/28/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU SITE WALL FROM TOP OF STEM TO 4'8"
1ST LIFT @ GRID B.5 TO END OF ROLLING GATE/5
AND @ B.5/3 TO 5 -- OK TO GROUT
07/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALL TOP OUT @ 20'6" AT GRID C.5/3.5 TO 5 AND TOP OUT @ 24'8" AT GRIDS J/4 TO 5.3, 4/G.1 TO J AND G.1/3 TO 4 OK TO GROUT
07/15/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS TO 20FT AFF @ GRID LINES G.1/3 TO 4
4/G.1 TO J AND J/4 TO 5.2 -- OK TO GROUT
07/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TWO NORTH CMU COLUMNS - TOP OUT
07/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
EAST SHOWROOM WALL @ 12'8" TO 16'8"; WEST SHOWROOM
WALL @ 12/8" TO 16'8"; NORTH SHOWROOM COLUMN @ 12'8" TO 16'8" -- OK TO GROUT PROGRESS AREAS
07/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
EAST & WEST SHOWROOM TO 12'8";
2 COLUMNS @ NORTH TO 18'
07/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS AT GRID LINES 4/G.1 TO I & G.1/3 TO 4 TO 7 FOOT
4 INCH W/CLEANOUTS @ 1.1/D.9 & E.6 TO 13 FOOT 4 INCH AND C.5/3 TO 5 TO 8 FOOT
06/27/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. (2) NORTH CMU COLUMNS TO 8FT W/CLEANOUTS
2. WEST CMU SITE WALL SOUTH TO NORTH TOP OUT COMPLETE
06/25/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. STEM WALLS @ NORTH BLDG. COLUMNS @ 1/D.9 & E.9
2. MIDDLE 1/3 APPROX. 200 L.F WEST SITE CMU WALL
TOP OUT @ 10 FT
06/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
STEM WALL @ GRID LINES I/4 TO 5.5 - 4/G.1 TO I - G.1/3 TO 4
AND C.5/3 TO 5
06/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT AT NORTH HALF OF WEST RETAINING WALL/SITE
WALL TO 4 FOOT A TO F
04/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CMU WALLS ON GRID LINES
G/1.3 TO 5 & 5/F.5 TO G.1 FROM 20'8" TO 24'8" TOP OUT
04/01/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CMU WALL ON
GRID LINES G.1/3 TO 5 AND 5/F.5 TO G.1 FROM 16'8" TO 20'8"
03/28/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CMU WALL ON GRID LINES
G.1/3 TO 5 AND 5/F.5 TO G.1 4TH LIFT FROM 12'8" TO 16'8"
03/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU STEEL REINFORCEMENT @ GRID LINES 5/E.6 TO F AND G.1/5 TO 5.5 TOP OUT
03/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES 5/6.6 TO F.3 FROM 20'8" TO 24'8" AND G.1/5 TO 5.5 FROM 18'8" TO 22'8"
OK TO GROUT
03/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES C/5 TO 7.1 AND 5/C TO C.5 -- OK TO GROUT
03/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2 SOUTH JAM COLUMNS FROM 8' TO 12'
02/26/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCED STEEL CMU @ GRID LINES C/5 TO 7.1 AND 5/C TO C.5 FROM 20'8" TO 24' -- 5/E.9 TO F.5 TO 20'8"
G.1/5 TO 5.5 TO 16'8" - 3 CMU EAST COLUMNS TO 15'4" TO SOUTH JAM CMU COLUMNS @ G.10/7.1 FROM 4' TO 8'
02/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
FROM 16'8" TO 20'8"
CMU REINFORCEMENT STEEL @ GRID LINES C.5 TO 7.1 AND
5/C TO C.5 AND 3 CMU EAST COLUMNS @ K/5.2 - 6.1 AND 7
FROM 8'8" TO 12'8" AFF
02/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES C/5 TO 7.1
5/C TO C.5 AND 5/E.6 TO F.3 FROM 12'8" TO 16'8"
3 CMU COLUMNS @ K/5.2, 6.1 & 7 FROM 4'8" TO 8'8" AND
2 CMU JAMB COLUMNS @ 7/H & H.5 FROM 0' TO 4'8"
02/07/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINE C/5 TO 7.1
5/C TO C.5 - 5/E.6 TO F.3 - G.1/5 TO 5.5 - 1/5 TO 5.5
CMU CORNER @ 1/7.1 FROM 8'8" TO 12'8" AFF
01/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID B.8/5 TO 7 - 5/B.8 TO C.3
5/E.7 TO F3 -- G.1/5 TO 5.5 - 1/4 TO 5.3
CORNER @ 7.1/1 FROM 8'8" TO 12'8" AND ROOMS #178, 183 AND 184 FROM 0' TO 4' AFF -- OK TO GROUT
01/25/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID B.8/5 TO 7 - 5/B TO C.3
5/E.7 TO F.3 - G.1/5 TO 5.5 -- CORNER @ I/7
01/23/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/14/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WEST BLDG - CAR WASH TOP OUT
11/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) NORTH CMU BLDG WALL TOP OUT TO 24 FOOT 8 INCH
2) WEST BLDG STRUCTURE TO 16 FOOT
11/08/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID 7/B TO G.9
5TH LIFT TO 20 FOOT - OK TO GROUT
11/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES 7/B TO G.9
FROM 12 FOOT TO 16 FOOT
10/24/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT 2ND LIFT @ GRID 7/D9 TO G9
10/23/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES A TO B/9.3 TO 11
TO 8 FOOT A.F.F
7/B TO E - TO 8 FOOT AFF & 7/E TO H TO 4 FOOT AFF
10/17/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES 11/H,G,F,E,D,C,B
H/11 TO 9
B/11 TO 7
7/B TO D9
9.9/A.7 TO B
A.7/11 TO 9.5
A.4/11 TO 9.5
11/A TO A.7
9.5/A TO A.7 TO 4FOOT AFF
10/11/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SOUTH & WEST SITE WALLS TO 10 FOOT (TOP OUT)
10/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT @ WEST & SOUTH SITE WALLS TO 4FT
09/28/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*