Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T06CM05677
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2009 | REINFORCED MASONRY PRE-GROUT | Approved | ||
07/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ONLY CMU SITE WALL ON WEST SIDE RUNNING EAST TO WEST TOPOUT |
|
07/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU SITE WALL FROM TOP OF STEM TO 4'8" 1ST LIFT @ GRID B.5 TO END OF ROLLING GATE/5 AND @ B.5/3 TO 5 -- OK TO GROUT |
|
07/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL TOP OUT @ 20'6" AT GRID C.5/3.5 TO 5 AND TOP OUT @ 24'8" AT GRIDS J/4 TO 5.3, 4/G.1 TO J AND G.1/3 TO 4 OK TO GROUT |
|
07/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS TO 20FT AFF @ GRID LINES G.1/3 TO 4 4/G.1 TO J AND J/4 TO 5.2 -- OK TO GROUT |
|
07/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TWO NORTH CMU COLUMNS - TOP OUT |
|
07/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* EAST SHOWROOM WALL @ 12'8" TO 16'8"; WEST SHOWROOM WALL @ 12/8" TO 16'8"; NORTH SHOWROOM COLUMN @ 12'8" TO 16'8" -- OK TO GROUT PROGRESS AREAS |
|
07/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* EAST & WEST SHOWROOM TO 12'8"; 2 COLUMNS @ NORTH TO 18' |
|
07/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS AT GRID LINES 4/G.1 TO I & G.1/3 TO 4 TO 7 FOOT 4 INCH W/CLEANOUTS @ 1.1/D.9 & E.6 TO 13 FOOT 4 INCH AND C.5/3 TO 5 TO 8 FOOT |
|
06/27/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. (2) NORTH CMU COLUMNS TO 8FT W/CLEANOUTS 2. WEST CMU SITE WALL SOUTH TO NORTH TOP OUT COMPLETE |
|
06/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. STEM WALLS @ NORTH BLDG. COLUMNS @ 1/D.9 & E.9 2. MIDDLE 1/3 APPROX. 200 L.F WEST SITE CMU WALL TOP OUT @ 10 FT |
|
06/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* STEM WALL @ GRID LINES I/4 TO 5.5 - 4/G.1 TO I - G.1/3 TO 4 AND C.5/3 TO 5 |
|
06/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT AT NORTH HALF OF WEST RETAINING WALL/SITE WALL TO 4 FOOT A TO F |
|
04/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ CMU WALLS ON GRID LINES G/1.3 TO 5 & 5/F.5 TO G.1 FROM 20'8" TO 24'8" TOP OUT |
|
04/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ CMU WALL ON GRID LINES G.1/3 TO 5 AND 5/F.5 TO G.1 FROM 16'8" TO 20'8" |
|
03/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ CMU WALL ON GRID LINES G.1/3 TO 5 AND 5/F.5 TO G.1 4TH LIFT FROM 12'8" TO 16'8" |
|
03/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU STEEL REINFORCEMENT @ GRID LINES 5/E.6 TO F AND G.1/5 TO 5.5 TOP OUT |
|
03/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 5/6.6 TO F.3 FROM 20'8" TO 24'8" AND G.1/5 TO 5.5 FROM 18'8" TO 22'8" OK TO GROUT |
|
03/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES C/5 TO 7.1 AND 5/C TO C.5 -- OK TO GROUT |
|
03/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2 SOUTH JAM COLUMNS FROM 8' TO 12' |
|
02/26/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* REINFORCED STEEL CMU @ GRID LINES C/5 TO 7.1 AND 5/C TO C.5 FROM 20'8" TO 24' -- 5/E.9 TO F.5 TO 20'8" G.1/5 TO 5.5 TO 16'8" - 3 CMU EAST COLUMNS TO 15'4" TO SOUTH JAM CMU COLUMNS @ G.10/7.1 FROM 4' TO 8' |
|
02/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* FROM 16'8" TO 20'8" CMU REINFORCEMENT STEEL @ GRID LINES C.5 TO 7.1 AND 5/C TO C.5 AND 3 CMU EAST COLUMNS @ K/5.2 - 6.1 AND 7 FROM 8'8" TO 12'8" AFF |
|
02/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES C/5 TO 7.1 5/C TO C.5 AND 5/E.6 TO F.3 FROM 12'8" TO 16'8" 3 CMU COLUMNS @ K/5.2, 6.1 & 7 FROM 4'8" TO 8'8" AND 2 CMU JAMB COLUMNS @ 7/H & H.5 FROM 0' TO 4'8" |
|
02/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINE C/5 TO 7.1 5/C TO C.5 - 5/E.6 TO F.3 - G.1/5 TO 5.5 - 1/5 TO 5.5 CMU CORNER @ 1/7.1 FROM 8'8" TO 12'8" AFF |
|
01/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID B.8/5 TO 7 - 5/B.8 TO C.3 5/E.7 TO F3 -- G.1/5 TO 5.5 - 1/4 TO 5.3 CORNER @ 7.1/1 FROM 8'8" TO 12'8" AND ROOMS #178, 183 AND 184 FROM 0' TO 4' AFF -- OK TO GROUT |
|
01/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID B.8/5 TO 7 - 5/B TO C.3 5/E.7 TO F.3 - G.1/5 TO 5.5 -- CORNER @ I/7 |
|
01/23/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
11/14/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WEST BLDG - CAR WASH TOP OUT |
|
11/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) NORTH CMU BLDG WALL TOP OUT TO 24 FOOT 8 INCH 2) WEST BLDG STRUCTURE TO 16 FOOT |
|
11/08/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 7/B TO G.9 5TH LIFT TO 20 FOOT - OK TO GROUT |
|
11/02/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 7/B TO G.9 FROM 12 FOOT TO 16 FOOT |
|
10/24/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT 2ND LIFT @ GRID 7/D9 TO G9 |
|
10/23/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES A TO B/9.3 TO 11 TO 8 FOOT A.F.F 7/B TO E - TO 8 FOOT AFF & 7/E TO H TO 4 FOOT AFF |
|
10/17/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 11/H,G,F,E,D,C,B H/11 TO 9 B/11 TO 7 7/B TO D9 9.9/A.7 TO B A.7/11 TO 9.5 A.4/11 TO 9.5 11/A TO A.7 9.5/A TO A.7 TO 4FOOT AFF |
|
10/11/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH & WEST SITE WALLS TO 10 FOOT (TOP OUT) |
|
10/02/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT @ WEST & SOUTH SITE WALLS TO 4FT |
|
09/28/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* |