Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2008 | ENGINEERING - FINAL | Approved | ||
| 01/03/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP ONLY, COMPLETE THE FOLLOWING: 1) ALL RELATED SITE WORK SHOWN ON APPROVED SITE PLAN TO INCLUDE LANDSCAPING, ROCK RIP RAP, AND HYDROSEEDING OF RET/DET BASIN. 2) INSTALL WHEEL STOPS AS SHOWN ON PLAN. 3) INSTALL BICYCLE PARKING PER PLAN. 4) COMPLETE ALL ITEMS ASSOCIATED WITH FINAL GRADING FOR PERMIT# T07BU00123, SEE COMMENT ON 12/2/08 INSPECTION. |
|
| 12/28/2007 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY GRADING PERMIT T07BU00123 -COMPLETE ALL SITE WORK INCLUDING LANDSCAPING AND CLEAN UP -COMPLETE ALL STRIPING AND INSTALL PARKING STOPS -INSTALL BIKE PARKING OR PROVIDE LETTER FROM COT ZONING (1 CLASS I AND 6 CLASS II) -COMPLETE ALL WORK IN RIGHT OF WAY (H/C ACCESS RAMPS AND SIDEWALK) -INSTALL DRAINAGE RIP RAP -REMOVE MOBILE MINI, TEMPORARY DUMPSTER AND PORTA TOILET GRADING PERMIT MUST BE CALLED IN FOR FINAL GRADING -DRAINAGE/BASIN CERTIFICATION NEEDED FOR STORMDRAIN CONNECTION -PROVIDE REVISED APPROVED GRADING PLAN FOR GRADING INSPECTION PLAN ONSITE APPROVED BY MATT FLICK 2/22/07 CHANGES HAVE BEEN MADE TO STORMDRAIN |