Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED BACKFLOW CERTIFICATION |
|
| 07/17/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BACKFLOW CERTIFICATION 2. INSTALL FLOOR SINK GRATE COVER AND SEAL AROUND FLOOR SINK. 3. PERM CAP WATER SUPPLY TO CHAIRS IN MECHANICAL ROOM SUPPORT PIPING. CHAIRS ARE BOTTLED 4. SECURE EXPANSION TANK PROPERLY |
|
| 07/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CALL IN ALL PLUMBING INSPECTIONS THAT HAVE NOT BEEN APPROVED ON YOUR PERMIT CARD. 2. PROVIDE PROOF OF INSPECTION FOR AIR PIPING PER NFPA99 AS REQUESTED FROM 5/3/07 3. ALL FIXTURES AND APPLIANCES TO BE INSTALLED AND FULLY OPERATIONAL. 4. PROVIDE FACTORY TAPPED CLEANOUT PLUGS & MACHINE SCREWS FOR CLEANOUT COVERS. 5. INSTALL WATER HEATER PER PLAN PAGE P.1a DETAIL A 6. PROVIDE A MEANS TO CONTROL HOT WATER TEMPERATURE AT PUBLIC USE LAVS BESIDES THE WATER HEATER 7. PROVIDE BACKFLOW CERTIFICATION |