Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* I ADVISED YOU TO INSTALL INSULATION TYPICAL TO THE EXISTING -- YOU INSTALLED ARMAFLEX AND IT ISN'T INSTALLED PER MANUFACTURER'S SPECIFICATION |
|
| 12/21/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PROVIDE LADDER FOR ACCESS ABOVE FIRST FLOOR 2. REDLINE ALL CHANGES TO PLAN 3. WILL INSPECT CONDENSATE CONNECTION AT FINAL 4. HANGERS AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN SIX FEE FOR COPPER FOUR FEET FOR ABS 5. OK TO INSULATE HOT |
|
| 12/19/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |