Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/24/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. MAKE 2-WAY CLEANOUT TRAFFIC RATED 2. CLEANOUT MAY NOT BE DIRECTLY EMBEDDED IN CONCRETE 3. CLEANOUTS UNDE FRANK PATTERN COVER TO HAVE FEMALE THREADS AND AN APPROVED PLUG 4. SECURE ALL I.W PIPING 5. ALL ASPECTS OF PLUMBING FIXTURE SCHEDULE MUST BE MET OR SUPPLY PLAN REVISION 6. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
| 10/23/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - TRIM NOT INSTALLED PER PLAN - ALL IN PIPING REQUIRES MINIMUM ONE INCH AIR GAP - FLOOR SINKS REQUIRE GRADES AND STRAINERS - STEAMER REQUIRES BACKFLOW PROTECTION - ASME WATER HEATER REQUIRES ASME EXPANSION TANK - PROVIDE CLEAN BACTERIA REPORT |