Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PAINT EXPOSED PLASTIC 2. INSTALL STRAINERS & GRATES ON FS 3. REMOVE FLOW CONTROL ON 3 COMP-SINK CONNECTED TO INTERCEPTOR. 4. SAFETY CABLE MUST BE SHORTER THAN SUPPLY FLEX TO GAS EQUIPT. 5. STEAM CHEF REQUIRES BACKFLOW PROTECTION 6. SUPPORT INDIRECT DRAINS. INSTALL PVC DRAIN LINES SO THAT HUB IS INCORRECT DIRECTION OF FLOW. 7. RECEIVED 4 BACKFLOW CERTS FOR BEVERAGE AND ICE EQUIPMENT. 8. TEMPERATURE LIMITING DEVICES FOR PUBLIC USE LAVS |
|
| 03/22/2007 | PLUMBING - FINAL | Denied | DO YOUR ROOF FLASHINGS MEET SPECIFICATIONS? THEY DON'T APPEAR TO SEAL PROPERLY ALSO, 1/2 COPPER CANNOT TOUCH METAL |