Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 11/06/2006 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) NO PLANS/PERMIT ON SITE 2) REPAIRS NOT MADE |
|
| 11/03/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) RED HEAD ANCHOR BOLTS LOOSE 2) PLAN CALLS FOR KITCHEN DWV TO VENT TO ROOF 3) KITCHEN SHEAR MISSING ANCHOR BOLT 4) MASTER SHOWER NOT PROPERLY VENTED MUST VENT ABOVE CENTER LINE OF DRAIN 5) DUCT WORK NOT ? 6) 14" DUCT RESTRICTED 7) UPSTAIRS HALL BATH TOILET AND TUB NOT PROPERLY VENTED |