Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T06CM05111
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/02/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (1) BACKFLOW CERTIFICATION FOR LANDSCAPING SUPPLY WATER |
|
05/01/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTES ABOVE & COMPLY 1. ALL PVC PIPING REQUIRES PRIMER THEN GLUE NO FEMALE PLASTIC THREADED FITTING SHALL BE USED TO CONNECT TO MALE I.P CONNECTIONS. 2. EXPANSION TANK REQUIRES SUPPORT. 3. PROVIDE RIDGID APPROVED DRAINAGE PIPING, PROPERLY SUPPORTED, OVER 5' REQUIRE P-TRAP (DIRECTLY TRAPPED) RECEIVED (9) BACKFLOW CERTIFICATIONS AND CLEAN BACTERIA REPORT. NEED ONLY (1) LANDSCAPING BACKFLOW CERTIFICATION. NO PROBLEMS FOR TEMP C OF O FOR TRAINING (ONLY) |
|
04/27/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. COMPLETE ALL PLUMBING, PROVIDE BACTERIA REPORT, BACKFLOW CERTIFICATION. 2. PROVIDE PRESSURE RELIEF DEVICE FOR PRESSUR REGULATOR ON CARBONATOR SYSTEM. 3. MAKE FLOOR CLEANOUT FLUSH 4. PROVIDE WATER HAMMER DEVICES 5. 1" AIR GAP REQUIRED AT ALL INDIRECT DRAIN TERMINATIONS 6. COMPLETE INSULATION ON HOT PIPING. 7. PROVIDE APPROVED FITTINGS FOR WATER AT CARBONATOR BACKFLOW AREA. LIST MAY NOT BE COMPLETE |