Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 12/22/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* NOTE: FRAME DOES NOT GET INSPECTED UNTIL ALL INTERMEDIATE INSPECTIONS PASS 1. NAIL SIDING OFF AT 6" INTERVALS ON THE EDGES AND 12" IN THE FIELD. 2. INSTALL H2.5 HURRICANE CLIPS AT THE TOP OF EVERY OTHER STUD ON THE NORTH WALL TO THE EXISTING RAFTER. |