Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2007 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 01/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE 3" CLEARANCE FROM SOIL TO ALL STEEL AT GARAGE FOOTER. 2. PER DETAIL SECTION A-6 ALL UPRIGHTS 48" OK PER PLAN 3. EXTEND TPR VALVE TO EXTERIOR WITH 3/4" COPPER 4. PROVIDE DETAIL ON ANCHOR BOLTS OR HOLDDOWNS TO BE USED AT ENTRY WALL AND MID-POINT BEARING WALL AT BASE PLATES. |