Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM04969
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 11/19/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/15/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 2" PVC CW AND ABS SEWER PER REDLINES ON P-1 OK TO COVER IRRIGATION ASSEMBLY MUST BE INSTALLED |
|
| 11/14/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* SEWER AND YARD PIPING IS NOT ROUGH SOIL |
|
| 08/14/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* OK FOR CONCRETE EXCEPT FOR WASHING MACHINE BRANCH |
|
| 08/07/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. INSPECTOR NEEDS TO SEE ALL DEMO'D PIPE CAPPED OFF IN AN APPROVED MANNER. 2. WITH THREE PERMITS AT ONE ADDRESS IT IS IMPERATIVE TO CALL IN THE RIGHT INSPECTION CODE WITH THE CORRECT ACTIVITY NUMBER. 3. ABS DWV UNDER FLOOR, INSTALLED PER P-1 PLUMBING PAGE. WATER TEST ONE RISER TO TEN FEET. 4. P-1 SHOWS THREE RESIDENTIAL TYPE WASHING MACHINES FIXTURE UNIT CALCULATION SCHEDULE SHOWS EACH MACHINE AT 30FU'S -- PLEASE READ NOTE NUMBER FIVE ON TABLE 7-3 2003 UPC WHICH RATES EACH OF THE MACHINES AT 6 DFU'S - PLEASE REVISE PLAN AND MAKE NECESSARY FIELD CHANGES. 5. OK TO COVER THE REST |