Permit: T06CM04930

Parcel: 124050610

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T06CM04930

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/09/2007 PLUMBING - FINAL Approved IVRS - Inspection :*
1. REVISED APPROVED PLAN BY STANTEC 02/02/07
ON SITE
2. PLUMBING FINAL OK
OK FOR C OF O S.T.O.I
01/12/2007 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
PLUMBING INSTALLED PER REVISED PLAN OF 8/12/06
NO CITY APPROVAL ON REVISED PLAN
NEED BACKFLOW CERTS FOR INTERNAL ASSEMBLIES SER #5
A11201, A10937, A11181 AND 3366 AFTER RECEIVING CERTS
NO PLUMBING PROBLEM FOR TCO
NEED PLAN REVISION FOR FINAL APPROVAL
01/12/2007 PLUMBING - FINAL Partial Approval PENDING APPROVAL OF AS BUILT
ALL INSTALLATIONS PER CODE

OK TCO
ADD FEES FOR ELECTRIC FINAL AND PLUMBING FINAL
01/11/2007 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
SUPPORT INDIRECT WASTE PIPING, CONDENSATE AT ICE MAKER AND SOFT SERVE MACHINE ALSO, SUPPORT TRAP ARM AT HAND SINK.

REPLACE DAMAGED INDIRECT PIPING AT COFFEE,
SUPPORT AND PROVIDE SLOPE.
01/04/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. REVISED PLAN MUST GO THROUGH PLAN REVIEW
A. SUPPORT COPPER SUPPLIES TO 2-COMP SINK
B. I.W OVER FIVE FEET IN LENGTH TO BE DIRECTLY TRAPPED
C. EACH WATER SUPPLIED DEVICE TO HAVE BACKFLOW PROTECTION.
D. NO SPLITTING DOWNSTREAM.

YOU ADDED GAS TO THE PERMIT BUT
I DON'T SEE IT ON THE PLAN. IMPORTANT TO SHOW TOTAL DEVELOPED LENGTH AND BTU CONSUMPTION (ISOMETRIC)
12/13/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. EACH WATER SUPPLIED DEVICE REQUIRES BACKFLOW PROTECTION.
2. AIR GAPS WILL BE ENFORCED.
3. FLOOR SINKS REQUIRE GRATES AND STRAINERS.
4. INSPECTION STOPPED.
12/10/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL. HAVE PLUMBER COMPLETE ALL WORK I.E INSULATION PIPING, SUPPORT, IN PIPING BACKFLOW PROTECTION ETC.
CONTINUED NOT READY'S WILL RESULT IN REINSPECTION FEE
11/17/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. SEE NOTE #3 ABOVE -- IT READS OK TO COVER EXCEPT AT MOP SINK - MOP SINK COVERED WITHOUT INSPECTION.
2. UNABLE TO LOCATE PLAN, PERMIT, OR INSPECTION HISTORY. DO NOT CALL FINAL UNTIL YOU ARE READY.