Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T06CM04930
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1. REVISED APPROVED PLAN BY STANTEC 02/02/07 ON SITE 2. PLUMBING FINAL OK OK FOR C OF O S.T.O.I |
|
01/12/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PLUMBING INSTALLED PER REVISED PLAN OF 8/12/06 NO CITY APPROVAL ON REVISED PLAN NEED BACKFLOW CERTS FOR INTERNAL ASSEMBLIES SER #5 A11201, A10937, A11181 AND 3366 AFTER RECEIVING CERTS NO PLUMBING PROBLEM FOR TCO NEED PLAN REVISION FOR FINAL APPROVAL |
|
01/12/2007 | PLUMBING - FINAL | Partial Approval | PENDING APPROVAL OF AS BUILT ALL INSTALLATIONS PER CODE OK TCO ADD FEES FOR ELECTRIC FINAL AND PLUMBING FINAL |
|
01/11/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* SUPPORT INDIRECT WASTE PIPING, CONDENSATE AT ICE MAKER AND SOFT SERVE MACHINE ALSO, SUPPORT TRAP ARM AT HAND SINK. REPLACE DAMAGED INDIRECT PIPING AT COFFEE, SUPPORT AND PROVIDE SLOPE. |
|
01/04/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. REVISED PLAN MUST GO THROUGH PLAN REVIEW A. SUPPORT COPPER SUPPLIES TO 2-COMP SINK B. I.W OVER FIVE FEET IN LENGTH TO BE DIRECTLY TRAPPED C. EACH WATER SUPPLIED DEVICE TO HAVE BACKFLOW PROTECTION. D. NO SPLITTING DOWNSTREAM. YOU ADDED GAS TO THE PERMIT BUT I DON'T SEE IT ON THE PLAN. IMPORTANT TO SHOW TOTAL DEVELOPED LENGTH AND BTU CONSUMPTION (ISOMETRIC) |
|
12/13/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. EACH WATER SUPPLIED DEVICE REQUIRES BACKFLOW PROTECTION. 2. AIR GAPS WILL BE ENFORCED. 3. FLOOR SINKS REQUIRE GRATES AND STRAINERS. 4. INSPECTION STOPPED. |
|
12/10/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL. HAVE PLUMBER COMPLETE ALL WORK I.E INSULATION PIPING, SUPPORT, IN PIPING BACKFLOW PROTECTION ETC. CONTINUED NOT READY'S WILL RESULT IN REINSPECTION FEE |
|
11/17/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #3 ABOVE -- IT READS OK TO COVER EXCEPT AT MOP SINK - MOP SINK COVERED WITHOUT INSPECTION. 2. UNABLE TO LOCATE PLAN, PERMIT, OR INSPECTION HISTORY. DO NOT CALL FINAL UNTIL YOU ARE READY. |