Permit: T06CM04930

Parcel: 124050610

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T06CM04930

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/16/2007 ELECTRIC - FINAL Approved IVRS - Inspection :*
SUBJECT TO AS BUILDS BEING STAMPED BY PLAN CHECK -- STANTEC
01/12/2007 ELECTRIC - FINAL Partial Approval PENDING APPROVAL OF AS-BUILT

OK TCO
ADD FEES FOR ELECTRIC FINAL AND PLUMBING FINAL
01/11/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1. PANEL DIRECTORY'S ARE NOT CORRECTLY IDENTIFIED
GO THROUGH AND MAKE SURE EACH BREAKER GOES TO WHAT IT SAYS IT GOES TO - NEC 408.4
2. EMERGENCY LIGHTING NOT INSTALLED PER PLAN.
3. IN REAR EXIT HALL, LIGHTS DO NOT TURN OFF @ PANELS, EMERGENCY LIGHT NOT WORKING AND PROVIDE LADDER FOR INSPECTIONOF DROP CEILING AREAS INCLUDING KITCHEN.
4. KITCHEN LIGHT SWITCH IS A 3-WAY SWITCH BUT NOT 3-WAY CKT? NEC 404.7
5. INSTALL LISTED STRAIN RELIEF FITTINGS FOR RECEPTACLE PENDANTS - NEC 400.10
6. MOVE EQUIPMENT AWAY FROM WALL SO I CAN CHECK RECEPTACLES.
7. ALL EQUIPMENT TO BE LISTED, I CAN'T SEE ANY LABELS
ON SOME EQUIPMENT, SOME LABELS NOT IDENTIFIED FOR ELECTRICAL?
8. PROVIDE ACCESS TO ROOF FOR INSPECTION
9. ISOLATED GROUND AT ENTRY ISLAND?

PARTIAL INSPECTION ONLY
12/21/2006 ELECTRIC - FINAL Denied PARTIAL INSPECTION NEED COMPLETE
1. EMERGENCY LIGHTING IS NOT INSTALLED PER PLAN AND NEEDS TO MEET THE REQUIREMENTS OF NEC 700.12E
INSPECTION STOPPED AT THIS POINT NEED TO HAVE AN APPROVED POWER PLAN THAT REFLECTS ACTUAL SCOPE OF WORK ON SITE.
12/12/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*