Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* OK TO COVER ALL AREAS CALL FOR GAS |
|
| 11/28/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NOBODY HOME |
|
| 11/27/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* - TYPE L COPPER REQUIRED BELOW SLAB. - HORIZONTAL CHANGES OF DIRECTION IN DRAINAGE PIPING SHALL BE MADE W/WYE PATTERN FITTINGS EQUIVALENT TO 1/8" BEND OR SWEEP OF EQUIVALENT RADIUS. - ELIMINATE THE USE OF EXCESSIVE 90 DEG. W/45 DEG. FITTINGS WHRE POSSIBLE. ELIMINATE VENT 90 DEG. BELOW FLOOD RIM. |
|
| 11/17/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. ALL UNDERFLOOR PIPING TO BE SUPPORTED HAVE 03050 GAS PRESSURE TEST ADDED TO YOUR PERMIT REMOVE UNUSED PIPING. 2. SUPPORT ALL PIPING ABOVE FLOOR. 3. SOLDERED JOINTS UNDER CONCRETE NOT PERMITTED. |
|
| 11/14/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. AVB'S ARE NOT INSTALLED UNTIL THE RETAINING SCREW IS BROKEN OFF. 2. HAVE 03050 GAS PRESSURE TEST ADDED TO YOUR PERMIT HAVE APPROVED GAS PLAN ON SITE. 3. YARDWATER OK TO COVER WITH CLEAN FILL. 4. SOLDERED COPPER JOINTS UNDER SLAB NOT APPROVED. COPPER IN MASONRY TO BE PROTECTED 5. SLIP NUT TUB DRAIN REQUIRES ACCESS PANEL. 6. CAP OFF ALL OPEN WASTE PIPING - PROVIDE LIGHT FOR UNDER FLOOR INSPECTION. |
|
| 11/06/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |