Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* APPROVED PER APPEAL |
|
| 02/21/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :$ PROVIDE APPROVED WAIVER OR MAKE CORRECTIONS |
|
| 02/14/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/30/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. PROVIDE PROPER BONDING FOR CKT'S OVER 250V - NEC 250.97 -- CHECK FOR RACEWAYS ON ALL ALTERED EQUIPMENT TO INSURE FAULT PATH IS RELIABLE. 2. IDENTIFY ALL EQUIPMENT PER PLAN 3. STILL DO NOT HAVE PROPER WORKING CLEARANCES FOR EQUIPMENT -- NEC 110.26 |
|
| 01/24/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. LABEL DISCONNECTS & EQUIPMENTS 2. MAINTAIN WORKING CLEARANCES 110.26 3. TIGHTEN LOOSE FITTINGS. 4. BOND ENCLOSURES 5. BOND BUSHINGS NEEDED AT CONCENTRICS 250.97 6. ELECTRICAL WORK NOT REFLECTED AS PER PLANS. |
|
| 01/22/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* HAVE THE ELECTRICIAN ON SITE TO OPEN EQUIPMENT, PROVIDE ACCESS ETC. ALL EQUIPMENT TO BE IDENTIFIED, HAVE PLANS FOR INSPECTION. |