Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T06CM04838
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2007 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
07/11/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CT ROOM WALLS |
|
07/03/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
06/27/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO ENERGIZE CHILLER FOR MAGNET ONLY *NOTE: ELECTRICAL FOREMAN TO CHECK S.C RATINGS FOR EQUIPMENT START AT SERVICE & WORK THROUGH |
|
06/25/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK PERFORMANCE TEST (LETTER RECEIVED TODAY) 2. OK BOND (MAIN) JUMPER SERVICE 3. OK FIRE SPRINKLER BOND 4. FINISH CHILLER WIRING & CALL FOR INSPECTION BEFORE YOU ENERGIZE. |
|
06/21/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) NEED A PASSING PERFORMANCE TEST REPORT NEC 230.95 C 2) TAP HOLE FOR MAIN BONDING JUMPER 3) BOND SPRINKLER PIPE 4) I WILL APPROVE TEP. DO NOT ENERGIZE THE SERVICE OR ANY EQUIPMENT BEFORE APPROVAL. KEEP LOCKED OFF. TEMP SERVICE LATERAL TO BE REMOVED AT SAME TIME |
|
06/20/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NO INSPECTION AT THIS TIME 1. FINISH SERVICE WIRING/BONDING 2. FINISH GROUNDING ELECTRODE SYSTEM 3. NEED TO HAVE SERVICE PERFORMANCE TESTED 4. PROVIDE TORQUE LETTER DO NOT CALL BEFORE COMPLETE |
|
06/18/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK RECEPTION AREA HALF WALL (NORTH MOST) |
|
06/06/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | ||
06/01/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK SOFFIT LIGHTING IN WAITING & RECEPTION AREAS |
|
05/23/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK WALL COVER AREA "A" EXCEPT MRI WALL |
|
05/17/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK WALL COVER AREA "A" -- MAIN LEVEL, WEST OF ENTRY DOORS TO LINE 2-4 |
|
05/16/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* AREAS WEST OF ENTRY DOORS HAVE NOT BEEN APPROVED TO INSULATE OR DRYWALL AND MUST BE OPEN FOR INSPECTION 1 SIDE DRYWALL OK |
|
05/10/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK WALL COVER PART "B" -- EAST OF ENTRY DOORS, MAIN LEVEL ALSO, J-BOXES FOR EXTERIOR LIGHTING WILL BE BROUGHT OUT OF WALLS BEFORE COVER. |
|
05/07/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* OK ONE SIDE DRYWALL PART B AREA 1. NEED NAIL PLATES WHERE AC CABLE LESS THAN 1 1/4" FROM STUD FACE. 2. GROUND BOXES 3. SECURE AC WITHIN 12" OF TERMINATIONS 4. BRING BOXES FLUSH TO WALLS 5. USE 277V COLORS FOR LIGHTING CKTS 6. FIRE ALARM BOXES TO BE RED 7. CHECK #151 WIRING @ PULL ALARM? 8. TIGHTEN LOCK NUTS & FITTINGS (OVER 250V RACEWAYS) |
|
05/01/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* THE SHELL PERMIT FOR THIS STRUCTURE HAS NOT BEEN CALLED IN. IT MUST BE CALLED IN AND FINALED BEFORE FURTHER ELECTRICAL COVER WILL BE APPROVED. PLANS FOR SHELL TO BE ON SITE FOR THAT INSPECTION. |
|
04/04/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK SECOND LEVEL WALL COVER |