Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/30/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. IT IS NOT INSTALLED PER PLAN. GAS PIPING IS SIZED BY DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION. PROVIDE AN ACCURATE PLAN AND INSTALL ACCORDINGLY. 2. DO NOT SUPPORT PIPE BY PARAPET. 3. SUPPORT PIPING PER TABLE 3-1 2003 UPC |