Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
12/13/2006 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
12/07/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. REMOVE SOIL FROM AROUND STEEL SLEEVE
2. REINFORCING STEEL MUST BE 3" FROM SOIL
3. HOLDDOWNS TO SHALLOW SEE INSTALLATION MANUAL
4. REINFORCING STEEL CANNOT BE WITHIN 1 1/2" OF FORMS
5. POST TENSION CABLES HAVE BEEN RESET
YOU MUST HAVE A NEW SPECIAL INSPECTION REPORT DATED AFTER 6 DEC 06
WITH A SIGNATURE THAT CAN BE READ OR A PRINTED SIGNATURE.
11/30/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SLAB PENETRATION BY PLUMBING WITHIN 45 DEGREE OF CABLE ANCHOR REQUIRE STEEL PIPE SLEEVE PER 111/S3
2) PROVIDE A COPY OF POST TENSION INSTITUTE STANDARDS FOR CABLE DEFLECTION-EXCESSIVE DEFLECTION ON GABLE AT PLUMBING
3) HOLDOWNS IN TOO SHALLOW HOOK MUST BE 42 DEGREE FROM VERTICAL-SEE INSTALLATION MANUAL
4) HAVE DAMAGED CABLES REPAIRED BY POST TENSION INSTITUTE STANDARDS AND HAVE LSI RECERTIFY
5) NO PLOT PLAN ON SITE AND WRONG PAPERWORK
11/28/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. INSTALL ANTI-SIPHON VALVE AS PREVIOUSLY REQUESTED.
2. PROVIDE CLEARANCE BETWEEN PLUMBING BOXES & REBAR.
3. EXCESSIVE SWEEP IN TENDON AROUND PLUMBING BOX.
4. INSUFFICIENT LAP IN REBAR JOINTS @ FRONT OF GARAGE.
5. PIPE INSERT REQ'D
6. PATIO FOOTERS MUST BE CENTERED UNDER COLUMNS.
7. TAPE DAMAGED TENDON @ FRONT OF GARAGE.