Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2006 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 12/07/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REMOVE SOIL FROM AROUND STEEL SLEEVE 2. REINFORCING STEEL MUST BE 3" FROM SOIL 3. HOLDDOWNS TO SHALLOW SEE INSTALLATION MANUAL 4. REINFORCING STEEL CANNOT BE WITHIN 1 1/2" OF FORMS 5. POST TENSION CABLES HAVE BEEN RESET YOU MUST HAVE A NEW SPECIAL INSPECTION REPORT DATED AFTER 6 DEC 06 WITH A SIGNATURE THAT CAN BE READ OR A PRINTED SIGNATURE. |
|
| 11/30/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SLAB PENETRATION BY PLUMBING WITHIN 45 DEGREE OF CABLE ANCHOR REQUIRE STEEL PIPE SLEEVE PER 111/S3 2) PROVIDE A COPY OF POST TENSION INSTITUTE STANDARDS FOR CABLE DEFLECTION-EXCESSIVE DEFLECTION ON GABLE AT PLUMBING 3) HOLDOWNS IN TOO SHALLOW HOOK MUST BE 42 DEGREE FROM VERTICAL-SEE INSTALLATION MANUAL 4) HAVE DAMAGED CABLES REPAIRED BY POST TENSION INSTITUTE STANDARDS AND HAVE LSI RECERTIFY 5) NO PLOT PLAN ON SITE AND WRONG PAPERWORK |
|
| 11/28/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL ANTI-SIPHON VALVE AS PREVIOUSLY REQUESTED. 2. PROVIDE CLEARANCE BETWEEN PLUMBING BOXES & REBAR. 3. EXCESSIVE SWEEP IN TENDON AROUND PLUMBING BOX. 4. INSUFFICIENT LAP IN REBAR JOINTS @ FRONT OF GARAGE. 5. PIPE INSERT REQ'D 6. PATIO FOOTERS MUST BE CENTERED UNDER COLUMNS. 7. TAPE DAMAGED TENDON @ FRONT OF GARAGE. |