Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 25 PSI TEST ON PIPING SYSTEM PER PLAN OK CONTRACTOR CAN TIE IN AND RE-ENERGIZE SYSTEM TO WATER HEATER AFTER THESE ITEMS CORRECTED 1. WATER HEATER & FURNACE TO HAVE SEDIMENT TRAPS AT GAS ENTRY. 2. T&P DRAIN TO GRAVITY DRAIN TO DAYLIGHT 3. DRAFT HOOD FOR WATER HEATER TO BE PROPERLY INSTALLED. |
|
| 02/23/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 25 PSI TEST FROM METER LOCATION 1" TO 1" STUB UP AT NORTHEAST AND 1/2" AT EAST SIDE OK SHALL SEE CONTINUATION OF COMPLETED PIPING SYSTEM WITH TEST ON ENTIRE SYSTEM TO OK |
|
| 02/22/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |