Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T06CM04683

Parcel: 11202033P


Addresses:

2000 E ROGER RD G

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
09/19/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
THIS BUILDING HAS NON-METALLIC INTERIOR WATER PIPING.
1. DOOR LOCKED -- NO ACCESS
REINSPECTED 2:15 PM

PLUMBING FINAL OK
OK FOR C OF O S.T.O.I
09/15/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. NO AVB ON HOSE BIBB
2. NO FULL PORT VALVE AT WATER HEATER
3. CONTINUED "NOT READY'S" MAY RESULT IN A REINSPECTION FEE.
4. AT KITCHEN SINK -- MAY NOT INTERMINGLE MATERIAL TYPES I.E ABS AND PVC MUST USE DRAINAGE FITTINGS -
PVC PRESSURE 45 DEG. NOT APPROVED FOR DRAINAGE.
09/08/2006 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
- OK TO COVER WALLS
- FOR FINAL INSPECTION, WH SUPPLY VALVE SHALL BE FULL-PORT,
- SEDIMENT TRAPS REQUIRED ON GAS PIPING
- ALL FIXTURES SHALL BE INSTALLED FOR FINAL INSPECTION
- ALSO, PLEASE PROVIDE A HOSE BIB VACUUM BREAKER ON EXTERIOR HB ASSOCIATED W/THIS UNIT.