Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T06CM04683
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/19/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
09/06/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* CAST TO PLASTIC TRANSITION IS LOOSE RECONNECT USING MISSION COUPLINGS ALSO PVC AT CEILING IS BURNED - REPLACE ANY DAMAGED PIPING. PLEASE TEMP CAP ANY OPEN SEWER PIPES DURING CONSTRUCTION. CONDENSATE, T&P DRAIN, AND DRAIN PAN ARE OK |
|
08/31/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* - PRESSURE TEST HOLDING - UPC REQUIRES THAT A WH INSTALLED ON A SUB-FLOOR HAVE A DRAIN PAN WITH A DRAIN TO EXTERIOR. - PROTECT DRAIN T&P WITH SAFETY PLATES. - PROTECT CONDENSATE TRAP SEAL W/TRAP PRIMER OR CAP AND RUN A NEW CONDENSATE DRAIN TO APPROVED LOCATION. |
|
08/23/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* PROVIDE PRESSURE TEST SUPPORT PIPING SUPPORT T&P PIPING CONDENSATE DWV APPEARS TO BE BURNT AT CEILING |