Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06CM04628

Parcel: 140550520

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
09/29/2006 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection :*
09/27/2006 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection :*
1) PATIO COLUMNS STILL NOT PER DRAWINGS
09/22/2006 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) 3 KINGS AT GARAGE HDR PER PLAN
2) 2 NAILS REQUIRED INTO BOTTOM PLATE OF EVERY WIND BRACE
3) NAILS OVER SET IN REAR SHEAR NAILS
4) DBL 2 X 8 HDR MISSING AT ENTRY
5) INTERIOR GARAGE SHEAR TRANSFER NOT PER PLAN
6) HINGE BRACING NOT PER PLAN
7) PROVIDE POSITIVE CONNECTION AT PATIO LEDGER
8) PROVIDE CITY APPROVED TRUSS SPECS
9) 8D NAILS 6" ON CENTER REQUIRED INTO BIRD BLOCKS
10) NAIL HINGE BRACE BLOCKS THROUGH ROOF SHEATHING PER PLAN