Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2007 | PLUMBING - FINAL | Approved | ||
| 10/02/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - I CAN SEE TRACER WIRE AT THE METER SO I WILL APPROVE YARDWATER CLEANOUTS TO BE MADE ACCESSIBLE. - GREEN SOLVENT CEMENT NOT ALLOWED ON ABS - GREEN SOLVENT CEMENT NOT ALLOWED FOR PVC - NO NOTICE IN ELECTRIC SERVICE POWER MAY NOT BE A COMPLETE LIST |
|
| 10/01/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NO INSPECTION HISTORY ON SITE 2. PROVIDE INSPECTION HISTORY FOR YARDWATER PIPING 3. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
| 09/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) YOU ARE REQUIRED TO CALL IN, AND HAVE APPROVED, ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL 2) YOU MUST MAKE ALL CORRECTIONS NOTED, AND UNCOVER ALL WORK COVERED WITHOUT APPROVAL 3) CONTRACTOR TO PAY REINSPECTION FEE |
|
| 03/02/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/23/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE REDLINE DRAWING FOR ROUGH-SOIL CHANGES 2. HCS NOT PER PLANS |