Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 01/30/2007 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Remove dumpster. 2- Complete all striping. 3- Cut control joints into sidewalk and HC ramp. |
|
| 01/26/2007 | ENGINEERING - FINAL | Not ready for Inspection | Complete HC ramp and parking. | |
| 01/23/2007 | ENGINEERING - FINAL | Not ready for Inspection | Met with contractor went over HC ramp installation. OK for contractor to use 2' X 10' Trucated dome mat. Spoke to Lee Ray in regards to. |