Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
Permit Number - T06CM04508
Inspection Description - ELECTRIC - SERVICE UPGRADE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2007 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection :* | |
07/13/2007 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection :* 1. VERIFY GUTTER ON ROOF CLOSED AS PER NOTE #3 INSP. ON 7/5/07 2. CLEARANCE WILL BE SENT UPON VERIFICATION FROM ERIC AT TEP FOR GUY WIRE RELOCATION. INSPECTOR HAS CALL IN TO ERIC AT TEP, NO RETURN CLL YET ERIC FROM TEP CONTACTED DAN S.C WILL RELOCATE GUY WIRE |
|
07/05/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. THE POLE WIRE IN FRONT OF SERVICE RESTRICTS 3' CLEARANCE REQUIRED BY 110-26 NEC FOR IN FRONT OF SERVICE. 2. UFER FROM GROUND RODS HAS TO BE JUMPERED FROM LUG TO NEUTRAL 3. GUTTER OPEN ON ROOF |
|
06/21/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLANS CALL FOR FUSED SERVICE DISCONNECT T-RATED FUSES - SEE NOTES ON PLAN -- CONTR. INSTALLED BREAKER |
|
06/07/2007 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection :* 1. OK CORRECTIONS AT SERVICE 2. PROVIDE ROOF ACCESS & BUILDING ACCESS TO INSPECT CONTINUATION OF 200 AMP FEEDER ON ROOF AND INTO BLD. (BUILDING LOCKED) NEED TO REVIEW PLANS AS PER INSP. 4/11/07 NOTES |
|
06/05/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOTES: 1. KO PULLED OUT AT 2" LOAD TERMINATION 2. BUSHING REQUIRED FOR TERMINATION #4 OR LARGER CONDUCTORS PER NEC 3. INSTALL BOND SCREW OR MAIN BONDING JUMPER AT GROUNDED CONDUCTOR TERMINATION IN SERVICE DISCONNECT. 4. EXPOSE BOTH GROUND RODS 5. BOND FITTINGS AHEAD OF OVERCURRENT PER 250.94 NEC |