Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 05/09/2007 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Complete all changes to parking lot, per phased plan. 2- Install all HC ramps per COT details. 3- Stabilize all areas disturbed by construction. On and off site. 4- Install trash enclosure per COT standards 6.01. 5- Show trash enclosure on grading plan. 6- Seperate all construction activity from public access. 7- Stop all stormwater flow across HC ramps. 8- Install all wheel stops. 9- Stop all work outside property line. |
|
| 05/07/2007 | ENGINEERING - FINAL | Denied | NOT READY FOR INSPECTION RELATED TO GRADING PERMIT #T07BU00666 1. COMPLETE ALL SITE WORK ADJACENT TO THIS BUILDING. 2. COMPLETE HANDICAP PARKING AND PARKING IN FRONT OF BUILDING, THIS IS SHOWN AS THE PUBLIC ENTRY AND THE A.D.A. ACCESSABLE ROUTE FOR BOTH WEST AND SOUTH BUILDINGS. 3. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. PAT 237-7620 - UPH CLIFF 488-9791 - BFL |