Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM04478
Inspection Description - ELECTRIC - FINAL
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210* 1. I WILL NOT APPROVED THIS TYPE OF ANCHOR FOR THE SUPPORT OF THIS MAST OR STIFF ARM IT IS NOT EFFECTIVE 2. AC - IDENTIFY EQUIPMENT GROUNDS AND TERMINATE PROPERLY - NEED 36" IN FRONT OF DISCONNECT CLEAR NEED WORKING SERVICE RECEPTACLE ON ROOF REPAIR OR REPLACE EXISTING RECEPT. |
|
09/05/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* #1 & #4 NOT CONNECTED |
|
08/31/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210* 1. LEAD ANCHORS FOR MAST NOT GRABBING/NOT EFFECTIVE NEC 230.28, 110.3 2. BECAUSE LENGTH OF SERVICE DROP IS LONG, USE LISTED GUY KIT OR STIFF ARM. 3. GAS BOND CLAMP IS LOOSE 4. PROVIDE ACCESS TO WATER BOND, ROOF AND INTERIOR. |
|
08/30/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* WORK IN PROGRESS |