Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06CM04470

Parcel: 11206424A


Addresses:

2545 N TUCSON BL

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
06/25/2007 PLUMBING - GAS PRESSURE TEST Approved
05/14/2007 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
HAVE YOUR 5 LB. TO 1 LB. REGULATOR ON SITE WITH SHUT OFF VALVE INSTALLED

TEST FOR FURNACES/WATER HEATER PIPING OK
1. SHALL INSTALL 1 POUND X 7" REGULATOR WITH APPROVED GAS SHUT OFF VALVE JUST UPSTREAM OF REGULATOR AND RUN VENT FROM REGULATOR 5' FROM ANY OPENABLE WINDOW OR AIR INTAKE WITH APPROVED GAS PIPING MATERIAL.
2. TEST ON PIPING TO CREMATORY (PARTIAL) SEE NOTE #4 FROM 2/21/07 INSPECTION OR REMOVE THAT TEE FITTING & RETEST (2) VENT FROM REGULATOR ON CREMATORY SHALL BE APPROVED METAL PIPING TERMINATING 5' FROM DOOR OR ANY AIR INTAKE, TRACER IN UPWARD DIRECTION AND TERMINATE WITH WEATHER 90 DEG. AND VERMIN SCREEN ON OPENING.
3. VENTS FROM WATER HEATER/FURNACES SHALL BE INSTALLED CORRECTLY THRU ROOF WITH APPROVED VENT MATERIAL AND VENT CAP MINIMUM 2' ABOVE ANY AIR INTAKE.

NOTE: CONDENSATE SHALL GO TO PLANTER AREA
02/21/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*