Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2007 | ENGINEERING - FINAL | Approved | ||
| 12/26/2007 | ENGINEERING - FINAL | Cancelled | NOT READY, CANCELED BY CONTRACTOR. | |
| 12/24/2007 | ENGINEERING - FINAL | Cancelled | NOT READY, CANCELED BY CONTRACTOR. | |
| 11/29/2007 | ENGINEERING - FINAL | Cancelled | CANCELLED BY CONTRACTOR. | |
| 07/11/2007 | ENGINEERING - FINAL | Denied | 1. PROVIDE (2) CLASS I AND (2) CLASS II BICYCLE PARKING SPACES. 2. PROVIDE (2) HANDICAP PARKING SIGNS. 3. PROVIDE ROCK RIP RAP FLUSH WITH OUTLETS AT TYPE II SIDEWALK SCUPPER SOUTHEAST OF BUILDING. 4. CLEAN UP CONCRETE WASHOUT ON SOUTH SIDE OF BLDG. |