Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM04374
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
11/02/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) REMOVED FLOOR SINK NEXT TO HOOD CAPPED OFF BELOW FLOOR OK |
|
10/20/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER, STILL NEED REVISED PLAN FOR WATER PIPE SIZE AND WH AND TYPE LOCATION. |
|
10/19/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO CHANGE SINCE LAST INSPECTION. YOU ARE USING HANG TUFF PIPE SUPPORTS AS POLE SUPPORTS, RATHER THAN AS HANGERS, THE PIPE IS TO BE SUPPORTED, HANGERS ARE NOT TO BE INSTALLED ON FITTINGS. YOUR WATER PIPING IS UNDERSIZED PER PLAN. THIS BUILDING HAS A 2 1/2" WATER SERVICE. IT IS POSSIBLE TO PROVIDE AN INSTALLATION THAT REPRESENTS THE APPROVED PLANS. |
|
10/11/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* I DON'T BELIEVE THAT ZIP STICKS ARE LISTED TO BE USED AS STAND UP PIPE SUPPORTS. PROVIDE UPC LISTING W/INSTALLATION INSTRUCTIONS OR PROPERLY SUPPORT PIPING AT VENT OFFSET. COPPER AT SODA LOCATION OK TO COVER. |
|
10/09/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* JOB SITE LOCKED, UNABLE TO INSPECT. |
|
10/06/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CORRECT VENT SECURE AND ISOLATE COPPER AT SODA OK TO COVER OTHER AREAS GAS PRESSURE TEST OK |
|
10/05/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* - WH NOT PER PLAN - WATER PIPING NOT SIZED PER PLAN ALSO REMOVE EXCESS FLUX. - SECURE DROP EARED ELL AT HB AND INSTALL NONFURROUS PIPE NIPPLE. - VENT AT HAND SINK IS LESS THAN 10' FROM FORCED AIR INLET -- OFFSET - CONDENSATE CONNECTION TO VENT ON ROOF SHALL BE PIPED TO APPROVED LOCATION AND INSPECTED BY MECHANICAL INSPECTOR -- REPAIR VENT. - PRESSURE TEST ON STREAM OF ANSUL VALVE IS OK, NOT TEST UPSTREAM PIPING. CAP ELIMINATED GAS PIPING. NOTE: EXISTING PLUMBING APPERTENENCES SHALL BE BROUGHT UP TO CURRENT CODE REQUIREMENTS. |