Inspection Status: Not Ready
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
|
| 08/17/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - BATHROOM AREAS ONLY |
| 10/07/2016 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACHO - CLASROOMS ONLY PER DETAILS 16/S3.1 & 17/S3.1 |
| 05/20/2016 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACHO - IVRS - Inspection :* |
| 02/11/2016 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACHO - f-3 footers per detail 16/S3.1 to 1st beam south only Inspection :* |
| 02/24/2015 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by CSHARRA1 - F2 FOOTERS @ COVERED TERRACE WEST & EAST @ RAMPS ONLY |
| 02/24/2015 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACHO - IVRS - Inspection :* |
| 02/18/2015 |
COT - LCBU - Excavation/Rebar/Zoning |
RCAMACHO |
Partial Approval |
Entered by RCAMACHO - IVRS - Inspection :* |
| 06/01/2010 |
COT - LCBU - Excavation/Rebar/Zoning |
GDABBS |
Partial Approval |
Entered by GDABBS - IVRS - Inspection :*
1) 8 MASONRY COLUMN FOOTING AT NORTH AND SOUTH EXTERIOR WALLS OK |
| 03/16/2010 |
COT - LCBU - Excavation/Rebar/Zoning |
GDABBS |
Partial Approval |
Entered by GDABBS - IVRS - Inspection :*
1) FRONT ENTRY COLUMNS (2) FOOTINGS ON SOUTH SIDE OK |
| 09/23/2009 |
COT - LCBU - Excavation/Rebar/Zoning |
MHENSON |
Partial Approval |
Entered by MHENSON - IVRS - Inspection :*
1) 4 INTERIOR F8 SPECIAL FOOTINGS
2) REVISED PLAN 1/16/09
3) PROVIDE LAST 2 SPECIAL INSPECTIONS |
| 04/01/2009 |
COT - LCBU - Excavation/Rebar/Zoning |
MHENSON |
Partial Approval |
Entered by MHENSON - IVRS - Inspection :*
1. 18 F4 COLUMN FOOTINGS OK
2. CRUMB OUT FOOTINGS BEFORE SPECIAL INSPECTOR |
| 06/02/2008 |
COT - LCBU - Excavation/Rebar/Zoning |
MHENSON |
Partial Approval |
Entered by MHENSON - IVRS - Inspection :*
OK TO POUR F2 FOOTING
MIDDLE OF STAGE TO EAST WALL |
| 04/17/2008 |
COT - LCBU - Excavation/Rebar/Zoning |
MHENSON |
Partial Approval |
Entered by MHENSON - IVRS - Inspection :*
OK TO POUR FOOTING FOR PASTORS OFFICE AND DRESSING ROOM AND 60' OF EXTERIOR N.WALL |
| 11/14/2007 |
COT - LCBU - Excavation/Rebar/Zoning |
JBURGE |
Partial Approval |
Entered by JBURGE - IVRS - Inspection :*
NORTH & SOUTH WALL FOOTINGS F-2, F.3, F.1
*ENSURE A MINIMUM CLEARANCE OF 1" BETWEEN VERTICAL BARS - OK TO POUR FOOTINGS: COMMENTS OF 9/26/07 MUST BE COMPLETE |
| 09/26/2007 |
COT - LCBU - Excavation/Rebar/Zoning |
LHANLY |
Partial Approval |
Entered by LHANLY - IVRS - Inspection :*
VERTICAL REBAR REQUIRES 1" SEPARATOR MINIMUM OR PROVIDE ENGINEERING CALCULATIONS SHOWING "BUNDLED" BARS VERIFY WITH ENGINEER |