Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection : RECEIVED (1) IN HOUSE BACKFLOW CERTIFICATION |
|
| 09/19/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE SEE NOTE #3 ON P-1 DATED 8/2/06 AND INSPECTION 8/30/07 SHEET AND COMPLY 2) PROVIDE CORRECT DRAIN FOR R.O. SYSTEM 3) PROVIDE CORRECT APPROVED MATERIAL TYPE FOR ALL WATER PIPING, DIPPER SUPPLY AND R.O. SYSTEM. TRANSITION FROM METAL TO PLASTIC THREADED CONNECTION SO BE METAL FEMALE X PLASTIC MALE 4) SUPPORT R.O. PIPING CORRECTLY 5) CLEANOUT PLUGS ARE REQUIRED TO BE FACTORY TAPPED WHEN ACCEPTING CLEANOUT MACHINE SCREWS FOR ALL CLEANOUT COVERS |
|
| 08/30/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* YARD WATER OK 1. PUBLIC USE LAVS TO HAVE A MEANS TO PROVIDE HOT WATER NOT TO EXCEED 110 DEG. BESIDES THE WATER HEATER. 2. SHALL SECURE EXPANSION TANK AT WATER HEATER 3. MAKE WATER TIGHT ALL FIXTURES 4. SEE NOTE #3 ON P-1 AND PROVIDE BACKFLOW DEVICE WITH CERTIFICATION 5. ALL INDIRECT DRAINS TO HAVE 1" MINIMUM AIR GAP AT TERMINATION 6. COMPLETE ALL PLUMBING INSTALLS LIST NOT COMPLETE |
|
| 05/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL PLUMBING WORK 2) EXPOSE YARD WATER PIPING FOR INSPECTION 3) LIST NOT COMPLETE |