Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM04341
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
02/27/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER TEST WASTE & VENT THRU ROOF OK EVERYWHERE EXCEPT CEILING OF RESTROOM WATER & PIPING INTERIOR OF BUILDING ONLY OK (1) SHALL SEE RETEST OF ABOVE CEILING VENT IN RESTROOM (LEAKING) |
|
02/13/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 309-6025 LARRY PROVIDE TESTING ON ALL PIPING SEE NOTES FROM 2/9/07 INSP |
|
02/09/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE WATER OR AIR TEST ON ALL PIPING. 2. SHALL PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR HORIZONTAL X HORIZONTAL. 3. SHALL PROVIDE CLEANOUT FOR SINKS. 4. PROVIDE BANG PLATES & FHA STRAPS WHERE REQUIRED. 5. SHALL SUPPORT OVERHEAD PIPING CORRECTLY WITH APPROVED HANGERS AT CORRECT INTERVALS. 6. COPPER PIPING TO BE SECURE & HAVE ISOLATION FROM METAL STUDS. 7. LAV REQUIRES 1 1/2 DRAIN ARM NOT TO EXCEED 42" NOTE: H/C STOOL REQUIRES 16"-18" SIDE WALL CLEARANCE. 8. PROVIDE MID SPAN SUPPORT FOR VERTICAL VENTS WITH APPROVED CLAMPS. 9. INSTALL WATER PIPING PER PLAN. |
|
02/05/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO ACCESS AT 8:55 AM |