Inspection History Details
Inspection Status: Approved
Inspection History: STUCCO MESH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2006 | STUCCO MESH | Approved | IVRS - Inspection :* | |
| 10/12/2006 | STUCCO MESH | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BASEBOARD HEATER TO BE ON SEPERATE CIRCUIT 2) GOUND ALL METAL BOXES 3) INSTALL H2.5'S RAFTERS TO BEAM 4) CANNOT HAVE WEED SCREED SETTING DIRECTLY ON TOP O CONRETE OR FLAGSTONE 5) SECURE ROMEX WITHIN 12" OF BOXES 6) INSTALL BANG PLATES ELECTRIC THROUGHOUT 7) WINDOW SIZES NOT PER PLAN 8) STUD SPACING EXCEEDS 24" 9) ELECTRIC RECEPTACLES TO BE WITHIN 6' OF DOOR 10) STOPPED INSPECTION-INCOMPLETE |